Lump sum contract

Lump sum contract

Also known as: Fixed price contract, stipulated sum contract, fixed lump sum

Definition

A lump sum contract is a construction contract where the contractor agrees to complete a defined scope of work for a single fixed price. The price only changes through mechanisms the contract allows, such as variations, provisional sum adjustments or latent conditions, so the contractor carries the risk of its own costs.

How a Lump Sum Contract Works

The principal provides drawings, a specification and other contract documents. Contractors tender a single price to deliver that scope, and the winning price becomes the contract sum.

The contractor is paid through progress claims, usually based on the value of work completed each month against a schedule or trade breakdown. If the contractor's actual costs come in higher than planned, it absorbs the difference. If they come in lower, it keeps the saving. The contract sum is only adjusted for things like variations, provisional sums, prime cost items and other events the contract allows.

For a deeper look, read The Rulebook of Revenue: A Guide to Construction Contracts.

Lump Sum Contracts in AS 4000 and AS 2124

AS 4000-1997 and AS 2124-1992 are both construct only contracts that can be used on a lump sum basis or on a schedule of rates basis, with the choice recorded in the annexure. AS 4902-2000 is commonly used for lump sum design and construct work.

Under a schedule of rates arrangement, quantities are measured and paid at contract rates, so the final price can move with the quantities. Under a lump sum arrangement, the contractor carries quantity risk for the scope shown in the documents. Check which basis applies in the annexure and how any bill of quantities is treated.

Lump Sum Contract vs Cost Plus Contract

A lump sum contract gives the principal price certainty and puts cost risk on the contractor. It works best when the design is complete and the scope is well defined.

A cost plus contract pays the contractor's actual costs plus a margin, so the principal carries cost risk but has flexibility when the scope is unclear. Many projects mix the two, using a lump sum for the defined work and provisional sums or cost plus arrangements for uncertain parts.

When a Lump Sum Contract Suits

A lump sum contract works best when the design is complete, the scope is well defined and the site risks are understood. In those conditions contractors can price accurately, and the principal gets a firm number to fund and report against.

It suits less well where the design is still developing, where existing conditions are uncertain, or where the principal expects to make many changes. The contract then fills with allowances and variations, and the fixed price stops giving real certainty.

For contractors, the discipline is in the tender: check the documents for gaps, price risk deliberately, and raise clarifications before the price is locked in.

Common Mistakes With Lump Sum Contracts

  • Tendering on an incomplete design. Gaps in the documents become disputes over what was in the price. Clarify them during tender.

  • Too many allowances. Large provisional sums and PC items undermine the price certainty a lump sum is meant to give.

  • Missing variation entitlements. Changes are the main way the price can move. Record directions and price variations on time.

  • Not checking scope gaps across trades. Make sure subcontract scopes together cover the whole head contract scope.

Frequently asked questions

What is a lump sum contract in construction?

−

A lump sum contract is an agreement where the contractor completes a defined scope for one fixed price. The contractor carries the risk of its own costs, and the price only changes through variations and other adjustments the contract permits.

Can the price change on a lump sum contract?

−

Yes, but only through mechanisms in the contract. Common ones are variations, provisional sum and prime cost item adjustments, latent conditions and, where allowed, rise and fall. Otherwise the contractor's cost overruns or savings stay with the contractor.

Is AS 4000 a lump sum contract?

−

AS 4000 can be used as a lump sum contract or a schedule of rates contract, depending on what the annexure says. It is a construct only form, with the principal providing the design.

What's the difference between lump sum and schedule of rates?

−

A lump sum contract has one price for the whole scope, and the contractor carries quantity risk. A schedule of rates contract pays agreed rates for measured quantities, so the final price moves with the actual quantities of work done.

When is a lump sum contract a bad fit?

−

When the design is incomplete or the scope is likely to change a lot. In those cases the contract fills up with allowances and variations, and the fixed price stops giving real certainty. Cost plus or staged contracts may suit better.

On this page

Related terms

Browse the glossary

Finance & Budget

Manage the head contract from award to final account

Keep the contract sum, variations, provisional sums and progress claims together so the price never drifts unseen.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

Finance & Budget

Manage the head contract from award to final account

Keep the contract sum, variations, provisional sums and progress claims together so the price never drifts unseen.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136