Certificate of currency

Site administrator checking a subcontractor's insurance paperwork on a laptop in a site office before the crew starts work

Certificate of currency

Also known as: COC, certificate of insurance, insurance certificate

Definition

A certificate of currency is a short document from an insurer or broker confirming that a policy was active on the date it was issued. Builders collect them from subcontractors to prove the cover required by the subcontract exists. It proves the policy existed, not what it actually covers.

How a Certificate of Currency Works

A certificate of currency is issued by the insurer, or by the broker who placed the policy, at the request of the insured. It names the insured entity, the insurer, the policy number, the class of cover, the period of insurance and usually the sum insured or limit of liability. It is evidence that the policy was on foot at the moment it was printed.

On a construction project the flow is almost always the same. The head contractor sets out the insurances a subcontractor must hold, either in the subcontract or in the prequalification pack. The subcontractor asks their broker for certificates. The head contractor files them against the subcontractor record and checks them before anyone goes on site.

Because the certificate is a snapshot, the period of insurance printed on it does the real work. Most policies run for twelve months and the certificate is reissued at renewal. A subcontractor who was compliant in July can be uninsured in August without a single word on the original certificate changing.

For a deeper look, read Construction Insurance in Australia: What a Builder Actually Carries, and Where the Gaps Hide. Try the free Subcontractor Prequalification tool.

What a Certificate of Currency Does Not Tell You

This is where builders get caught. The certificate confirms that a policy existed on a date. It does not confirm that the policy will respond to a claim.

Exclusions are not listed. A public liability policy can exclude the exact activity the subcontractor was engaged for, such as hot work, work above a set height, or work on a live roof, and the certificate will not mention it.

Conditions and endorsements are not listed. Cover is often conditional on controls being in place, such as a permit system, a fire watch or security fencing.

Cancellation is invisible. A policy cancelled for non payment the week after issue still leaves a valid looking certificate in the file.

The limit can be shared. One limit of liability usually sits across every job the subcontractor is running, so a large claim on another builder's site can erode what is available on yours.

Where the risk is significant, ask for the policy schedule or a letter from the broker confirming the specific cover, rather than relying on the certificate by itself.

Which Policies Builders Ask Subcontractors For

The list changes with the trade and the contract, but on commercial work it usually covers the following.

Public and products liability. Covers injury to third parties and damage to third party property. Limits of $10 million or $20 million are common on commercial jobs, and the subcontract will state the figure required.

Workers compensation. Compulsory for employers in every state and territory. Sole traders and working directors are often not covered by it, which is one of the most common gaps found during onboarding.

Motor vehicle and mobile plant. Needed wherever the subcontractor brings vehicles or plant to site, and worth checking against the plant they actually turn up with.

Professional indemnity. Needed where the subcontractor carries design responsibility, which on design and construct jobs includes many services, structural and facade packages.

Contract works. Normally arranged for the project as a whole by the principal or head contractor rather than by each subcontractor.

Common Mistakes With Certificates of Currency

Collecting once, at onboarding. The certificate is only true on its issue date, so renewal tracking has to be systematic rather than left to memory. A register with expiry dates and a named owner is the minimum.

Accepting a certificate in the wrong name. The entity on the certificate has to match the entity that signed the subcontract. Trusts, related companies and labour hire arrangements frequently do not line up, and a mismatch can leave the policy responding to a different legal entity.

Not checking the period against the programme. Cover has to run for the whole time the subcontractor is on site, including any return visits to rectify defects long after the trade finished.

Treating the certificate as proof of adequacy. It proves existence. Whether the cover is adequate for the work is a question for the contract requirements and, on larger risks, for the broker.

Forgetting your own policies. A head contractor diligently chasing subcontractor certificates still has to keep its own contract works and liability cover current, and aligned with the contract value as variations move it.

Frequently asked questions

What is a certificate of currency in construction?

−

It is a document from an insurer or broker confirming that a policy was active on the date of issue. Head contractors collect them from subcontractors to show the insurances required by the subcontract are in place before work starts on site.

How long is a certificate of currency valid for?

−

Strictly, it is evidence only for the date it was issued. The period of insurance shown on it is usually twelve months, but a policy can be cancelled inside that period, so the certificate is not a guarantee the cover is still live today.

What is the difference between a certificate of currency and a policy schedule?

−

The certificate confirms a policy exists and gives headline details. The policy schedule sets out the limits, excesses, endorsements and exclusions that decide whether a claim is actually paid. Ask for the schedule when the risk is significant.

Does a certificate of currency prove a subcontractor is insured for my job?

−

Not on its own. It does not show exclusions or conditions, so a policy can be perfectly current and still exclude the work the subcontractor was engaged to do. Check the cover against the activity, not just the expiry date.

Who issues a certificate of currency?

−

The insurer, or the broker who placed the policy, at the request of the insured. It should come to you from the subcontractor or their broker, so treat a certificate passed on by another party as something to verify.

On this page

Procurement & Tendering

Chase every certificate of currency before it lapses

Keep subcontractor insurances, licences and expiry dates in one register against the job, with the renewal chasing handled for you.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

Procurement & Tendering

Chase every certificate of currency before it lapses

Keep subcontractor insurances, licences and expiry dates in one register against the job, with the renewal chasing handled for you.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136