Construction handover
software that collects
O&M documents as you go

O&M manuals, warranties, as-built drawings and commissioning certificates captured project-long, not scrambled at practical completion.

Built for handover to be a scheduled event, not a fire drill

Built for handover to be a scheduled event, not a fire drill

Configured by trade

Programme milestones populated from procurement, drawings and RFIs. No manual re-entry.

Collected as scope completes

Warranties, certificates and manuals uploaded as each subcontractor finishes, not at close-out.

One-click export

At handover, the O&M pack exports to PDF, USB or the client's DMS in one action.

THE PROBLEM

Six weeks out from PC. The O&M manual doesn't exist. It's a folder of PDFs and a list of everyone who owes you a document.

The client wants a complete O&M pack on handover. The subbies have moved on. Warranties are in emails. As-builts are still being marked up. The site admin is chasing 40 companies for documents that should have been handed over as each package finished.

Plexa collects O&M documents at the moment each subcontractor completes their scope. By practical completion, the pack is 95% built. The last 5% is a review, not a rebuild.

The PC-week scramble vs the complete O&M pack ready on day one

On the left, four staff, three shared drives, forty subbies to chase and six weeks of overtime. On the right, one Plexa dashboard, 95% complete before PC week, a review not a rebuild.

FAQ

Quick answers: everything you need to know about O&M handover in Plexa

What is a construction O&M manual?

What documents belong in an O&M handover pack?

How does Plexa help avoid the PC-week scramble?

Can we export the O&M pack to the client's DMS?

What happens if a subcontractor doesn't submit their O&M documents?

Does Plexa support handover for private and government clients?

Still Running Projects Across Five Different Platforms?

One platform, flat per-user, per-module pricing. External users always free.

Construction site manager in a hi-vis vest reviewing drawings on a tablet, framed in a chevron shape against a multi-storey building under construction.

Still Running Projects Across Five Different Platforms?

One platform, flat
per user, per-module pricing. External users always free.

Still Running Projects Across Five Different Platforms?

One platform, flat per-user, per-module pricing. External users always free.

Construction site manager in a hi-vis vest reviewing drawings on a tablet, framed in a chevron shape against a multi-storey building under construction.

© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136