Shop drawings

Also known as: Fabrication drawings, workshop drawings

Definition

Shop drawings are detailed drawings prepared by a subcontractor, fabricator or supplier showing exactly how a component will be made and installed, such as structural steel, precast panels, joinery or ductwork. They translate the design drawings into buildable detail and are submitted for review before fabrication.

How Shop Drawings Work in Practice

The design team issues drawings that show what is required. The trade that has to make it then produces shop drawings that show how: every member size, connection, weld, fixing, setout dimension and finish. A steel fabricator's shop drawings, for example, include individual piece marks for every beam and column so the workshop can cut and drill them and the erectors know where each one goes.

The typical cycle is:

  • Prepare. The subcontractor drafts shop drawings from the IFC drawings and specification.

  • Submit. They go to the head contractor, who checks coordination with other trades and forwards them to the designer or superintendent, usually as a submittal with a transmittal.

  • Review. The reviewer returns them marked, for example, reviewed no comment, reviewed with comments, or revise and resubmit.

  • Fabricate. Fabrication only starts once the drawings come back in an acceptable status.

For a deeper look, read Shop Drawings and Submittals: The Approval Queue That Delays the Programme.

Common Trades That Produce Shop Drawings

Almost any trade that fabricates off site will produce shop drawings. The most common are structural steel, precast concrete, post-tensioning and reinforcement, facade and curtain wall, windows and glazing, joinery and cabinetry, balustrades, mechanical ductwork, fire sprinklers, hydraulic services and lifts.

The specification usually lists which trades must submit shop drawings, the review period the designer has, and how many review cycles are allowed before the contractor wears the cost of further reviews.

On larger projects, trades such as steel, precast and services often model their work in 3D and produce shop drawings from the model. That makes clash checking against the architectural and structural models much easier, but the reviewed 2D drawings or approved model still need to be controlled like any other project document.

Shop Drawings vs IFC and As-Built Drawings

IFC, or issued for construction, drawings come from the designers and show the design intent. Shop drawings come from the trade and show how that intent will be fabricated and installed. As-built drawings, often called work as executed drawings in Australia, are prepared at the end to record what was actually built.

Review of shop drawings does not normally transfer design responsibility to the designer. Most contracts say the contractor remains responsible for errors in its shop drawings even after they have been reviewed, so read the review clause and stamp wording carefully.

Common Mistakes With Shop Drawings

  • Fabricating before review. It saves a week until the steel arrives and does not fit.

  • No coordination check. Shop drawings from different trades often clash. The head contractor needs to check them against each other, not just forward them.

  • Hiding design changes. If a shop drawing departs from the design, call it out clearly. A change slipped through review can still be rejected on site.

  • Poor revision control. Fabricators working from an old revision is a classic cause of rework. Track every revision and supersede the old ones.

  • Late submissions. Long review periods and multiple cycles can put fabrication on the critical path.

Frequently asked questions

Who prepares shop drawings?

−

The subcontractor, fabricator or supplier responsible for making and installing the component prepares them, usually with an in-house or contracted drafter. The head contractor coordinates and submits them for review by the design team or superintendent.

What is the difference between shop drawings and construction drawings?

−

Construction drawings, or IFC drawings, are produced by the designers and show what must be built. Shop drawings are produced by the trade and show precisely how each component will be fabricated, connected and installed to meet that design.

Does approving shop drawings make the designer responsible?

−

Usually not. Most Australian contracts state that review or approval of shop drawings does not relieve the contractor of its obligations or responsibility for errors. Check the contract wording and the reviewer's stamp.

Are shop drawings a submittal?

−

Yes. Shop drawings are one of the most common submittal types, alongside product data, samples and test certificates. They are tracked through a submittal register so everyone can see what is with the reviewer and what is approved.

On this page

Related terms

Browse the glossary

Site & HSEQ Management

Track every shop drawing from submission to approval

Submit shop drawings, route them to reviewers, record status and comments, and see what is overdue before it holds up fabrication.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

Site & HSEQ Management

Track every shop drawing from submission to approval

Submit shop drawings, route them to reviewers, record status and comments, and see what is overdue before it holds up fabrication.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136