Ask your projects data anything. Get answers in seconds. Plexa MCP Connector is live. See it in action

As-built drawings
Also known as: Work as executed (WAE) drawings, record drawings, as-constructed drawings, red-line drawings
Definition
As-built drawings are the final set of drawings that show a project as it was actually constructed, including every change from the design drawings. In Australia they are often called work as executed (WAE) drawings, and they are handed to the owner for operation, maintenance and future works.
How As-Built Drawings Are Produced
No project is built exactly as designed. Services get rerouted, setout moves, variations add or remove work and RFIs change details. As-built drawings capture those changes so the final record matches what is in the ground and in the walls.
The usual process starts on site. Trades and site engineers mark changes on a set of construction drawings as the work happens, often in red pen, which is where the term red-lines comes from. At the end of each trade's scope, those markups go back to the drafter or designer, who updates the CAD files or model. For civil works and underground services, a surveyor often picks up the actual positions and levels so the WAE drawings show real coordinates and depths. Each revision should be dated and tied back to the RFI, variation or site instruction that caused it.
When As-Built Drawings Are Required
Most head contracts and subcontracts require as-built or WAE drawings as part of the handover documents, and many make them a condition of practical completion or of releasing retention. Common requirements include:
Building services. Mechanical, electrical, hydraulic and fire services as-builts for the owner and facility manager.
Structure and architecture. Updated plans where the built layout differs from IFC.
Civil and stormwater. WAE plans with surveyed levels, often required by councils before accepting assets or releasing bonds.
Utilities. Water, sewer and electrical authorities generally require WAE information before they take over new assets.
The specification usually sets the format, such as PDF and native CAD or BIM files, and who must certify them.
As-Built Drawings vs Shop Drawings and IFC
IFC drawings show what the designer intended. Shop drawings show how a trade will fabricate and install its part. As-built drawings record what was actually done once the work is finished.
In a BIM project the same idea applies to the model. The as-built or record model is updated to reflect installed conditions so the owner can use it for facilities management.
The practical difference shows up years later. When a tenant wants to cut a new penetration or a plumber needs to find a buried valve, nobody looks at the IFC set or the shop drawings. They look at the as-builts, and if those are wrong the owner pays for exploratory work, damaged services or a redesign.
Common Mistakes With As-Built Drawings
Leaving it to the end. Trying to reconstruct changes from memory at handover produces inaccurate drawings. Mark up as the work is done.
No survey for buried services. Without surveyed positions and depths, underground as-builts are guesswork.
Ignoring subcontractor scope. Each trade should provide its own as-builts, and the head contractor needs to chase and check them.
Unchecked drawings. A quick walk through with the drawings in hand catches obvious errors before they are handed over.
Wrong format. Delivering scanned PDFs when the contract requires native CAD or model files can delay final payment.
Frequently asked questions
What does WAE mean in construction?
−
WAE stands for work as executed. It is the common Australian term for as-built drawings, especially in civil, stormwater and utility work, where WAE plans record the surveyed position and levels of what was built.
Who is responsible for as-built drawings?
−
Usually the contractor, who collects marked-up drawings from each trade and has them drafted or certified. The contract and specification decide who prepares, checks and certifies them, and whether the designer updates the original files.
What is the difference between as-built drawings and record drawings?
−
The terms are often used interchangeably. Where a distinction is made, as-built drawings are the contractor's markups of what was built, and record drawings are the formal updated set prepared from them, sometimes by the designer.
Are as-built drawings needed for practical completion?
−
Often, yes. Many Australian contracts list as-built or WAE drawings among the documents that must be handed over before practical completion is certified, or before retention or security is released. Check your contract's definition of practical completion.
Related terms
Browse the glossary
Free tools
All free resources
The AI Construction Operating System
One platform, one data model, every project. Built in Australia, for the world.
GET THE MOBILE APP
Platform
Solutions
© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136
