Ask your projects data anything. Get answers in seconds. Plexa MCP Connector is live. See it in action

RFQ

Also known as: Request for quotation, request for quote

Definition

An RFQ (request for quotation) is a request sent to suppliers or subcontractors asking for a price for a clearly defined scope of work or materials. In Australian construction, RFQs are used for smaller or simpler packages where price is the main deciding factor and a full tender process is not justified.

What RFQ Means

RFQ stands for request for quotation. Across most industries it means the same thing: the buyer already knows exactly what it wants and asks several suppliers what it will cost. The quote that comes back is a priced offer for that defined scope.

On a construction project, RFQs are sent by head contractors to subcontractors and suppliers for packages such as reinforcement supply, signage, line marking or small trade packages. Government agencies also use RFQs for lower value work, with the thresholds set by each agency's procurement policy.

Try the free Tender Comparison tool.

How an RFQ Works in Practice

The buyer issues a short package: scope, quantities or drawings, specification references, required dates, and the key commercial terms such as payment terms and retention. Suppliers return a price, usually with inclusions, exclusions and validity period.

The buyer then levels the quotes so they compare like for like, clarifies any gaps, and places a purchase order or subcontract with the chosen supplier. The quote, and anything attached to it, often becomes part of that order, so exclusions buried in a quote can become exclusions in the contract.

For a head contractor, the RFQ stage also feeds the budget. Quotes received at tender stage are often what the estimate was built on, so once the job is won, the package is usually re-quoted or negotiated against those numbers. Keeping the original quotes, clarifications and levelling sheets together saves time when the package is let and helps explain any movement from the tender allowance.

RFQ vs RFT vs RFP

The labels overlap and clients use them loosely, but the usual distinction in Australia is this.

  • RFQ. A defined scope, price is the main criterion, a short response and quick turnaround.

  • RFT (request for tender). A larger or more complex package with full documents, formal submission rules and evaluation on price and non-price criteria such as methodology, programme and experience.

  • RFP (request for proposal). Used when the buyer knows the outcome it wants but invites respondents to propose the solution, common for consultants and design and construct work.

Whichever label is used, read the conditions of the request. They set out what makes a response conforming.

In practice, many head contractors use RFQ for supply-only and small trade packages, and RFT for major subcontracts such as structure, façade and services.

Common Mistakes With an RFQ

  • Vague scope. If the request does not define the scope, every quote prices something different and levelling becomes guesswork.

  • Comparing headline prices only. Check exclusions, validity, lead times and assumptions before picking the cheapest.

  • Ignoring the terms. A supplier's own terms of trade can override yours if nobody reconciles them.

  • No paper trail. Clarifications by phone are easily disputed later. Record them and issue them to every supplier quoting.

Letting quotes expire. If the order is placed after the validity period, the supplier can reprice. Confirm the price is still held before you commit.

Frequently asked questions

What does RFQ mean in construction?

−

RFQ means request for quotation. A builder or client sends a defined scope to several subcontractors or suppliers and asks each for a price. It is used for smaller or simpler packages where a full request for tender process would be too slow or costly.

What is the difference between an RFQ and an RFT?

−

An RFQ is a lighter process for a well defined scope where price usually decides the outcome. An RFT is a formal tender with full documents and evaluation on price plus non-price criteria such as methodology, programme, experience and safety.

Is a quote binding once submitted?

−

A quote is generally an offer, and accepting it can form a contract on its terms. Most quotes state a validity period, and suppliers can usually withdraw before acceptance unless the request says otherwise. Check the RFQ conditions and the quote's own terms.

How many quotes should you get?

−

Three is a common rule of thumb for construction packages, and many government procurement policies set minimum numbers by value. More quotes help on price but cost time to level, so match the effort to the size and risk of the package.

On this page

Related terms

Browse the glossary

Procurement & Tendering

Compare quotes side by side, not in spreadsheets

Send RFQs from one place and level returned prices, inclusions and exclusions in a single comparison view.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

Procurement & Tendering

Compare quotes side by side, not in spreadsheets

Send RFQs from one place and level returned prices, inclusions and exclusions in a single comparison view.

Project record

Live

Variation V-014

Priced

RFI-022

Answered

SWMS-031

Approved

Progress claim 7

Submitted

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

One platform. One data model. Every project.

Book a 30-minute walkthrough with our team, built around how you run your sites.

© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136