Dilapidation report builder
Record the pre-existing condition of a neighbouring property room by room, with photos taken on your phone, and produce a dated report you can rely on later.
Why the dilapidation report exists
A dilapidation report records the condition of adjoining properties before construction starts. Its entire purpose is to answer, months later, one question: was that crack there before we began.
Without a dated record, that question has no good answer. The neighbour is certain it appeared during the excavation, you are certain it did not, and the dispute is resolved by whoever has evidence, which, in the absence of a survey, is nobody.
It is frequently a condition of consent for work involving excavation, piling, demolition or dewatering near other buildings. It is worth doing even when it is not.
Photographs are the report
Written descriptions of cracking are almost useless in a dispute. Hairline, moderate and significant mean different things to different people, and a description written by someone with an interest in the outcome carries very little weight.
A dated photograph of the crack with something for scale in the frame is worth more than a page of description. Take more than feels necessary. The one you did not take is always the one that matters.
This tool captures directly from the phone camera, downsizes the images so a report with fifty photos is still emailable, and embeds them in the PDF with their room and location. The photo and the record of where it was taken stay together, which is where most improvised approaches fall apart.
Be systematic, and record the absence of damage
Go room by room in a fixed order and record every room, including the ones with nothing wrong. A report that only documents defects cannot distinguish between a room that was undamaged and a room that was not inspected.
External elements matter as much as internal: paths, driveways, fences, retaining walls, boundary structures and any pavement you will be running plant across. Those are the ones that get damaged and the ones least likely to have been surveyed.
Note what you could not access. An inaccessible room is a real and useful entry. Leaving it out silently converts a gap in the survey into an implied clean bill of health.
Get it signed, and get it out before you start
The report is strongest when the property owner or occupier has seen it and acknowledged it before work begins. That converts it from your record of their property into a shared record, which is a very different thing in a dispute.
Issue it before the first machine arrives. A dilapidation survey conducted after excavation has started has lost most of its value and all of its credibility.
Consider a closing survey at completion using the same rooms in the same order. Comparing two structured reports is straightforward. Comparing a structured report with an argument is not.
The AI Construction Operating System
One platform, one data model, every project. Built in Australia, for the world.
GET THE MOBILE APP
Platform
Solutions
© 2026 Plexa Pro Pty Ltd. ABN 63 668 433 136